Durban Piling Contractors – #1 List of Professional Piling Contractors in Durban

Piling Contractors in Durban



CONTRACTORFIND.co.za™ is proud to showcase only the best, registered and certified Piling Contractors in Durban. Need qualified Piling Contractors for the job? CONTRACTORFIND.co.za™ is the place to find them! All the listed Piling Contractors below have been screened and certified, ensuring that their service and quality is the best in Durban. Find the top Piling Contractors in Durban now.

Don’t waste your time with inadequate service providers… allow us to provide you the best professional contractors for the job!

Contact: Jon Salliss

Professional building contractors and renovators. Projects delivered on time, on budget, every time.

Building plans professionally drawn and submitted to Ethekwini local council.

Rating:

5 (2 ratings)

Pinnacle Industries CC is a versatile construction group that has built its reputation around solid and reliable project delivery. We stand apart for our ability for service excellence in all spheres no matter how big, how complex, or how remote the project. t Pinnacle, we are well recognized, respected and our services are of a very high standard of quality. We bring an unmatched combination of knowledge, skill, experience and customer commitment to every job.

Rating:

0 (0 ratings)


Coastal Housing is in the construction / renovating / piling / retaining business, with our core focus on the suburban areas, in and around Durban.

Rating:

0 (0 ratings)

A specialist underpinning company for 25 years, using a unique hydraulic system known as jacked piling that lifts the structure before the pins are securely welded and concreted in position under the foundations. Then the unsightly cracks can be patched and painted once and for all.

Rating:

0 (0 ratings)

What is piling?

Deep foundations are sometimes indicated by geotechnical engineers when soil conditions are poor or a heavy design load needs to be carried.

Piling makes deep foundations possible. Piles are commonly made from reinforced concrete and steel

Auger Piles

Standard auger piling is the most commonly used pile and is best suited to partially saturated cohesive and residual soils. The piles are installed by means of drilling with an auger rig.

Drilling is carried out by rotation of the drilling head and lowering of the auger allowing it to penetrate into the soil. Once the auger flight is full with soil it is withdrawn and spun off. This procedure is repeated until the desired depth is reached.

Once the drilled hole has been completed, a reinforcing cage is lowered down into position. The shaft is then filled with concrete and is vibrated to assist compaction of the liquid concrete.

Continuous Flight Auger (CFA)

Standard auger piling is the most commonly used pile and is best suited to partially saturated cohesive and residual soils. The piles are installed by means of drilling with an auger rig.

Drilling is carried out by rotation of the drilling head and lowering of the auger allowing it to penetrate into the soil. Once the auger flight is full with soil it is withdrawn and spun off. This procedure is repeated until the desired depth is reached.

Once the drilled hole has been completed, a reinforcing cage is lowered down into position. The shaft is then filled with concrete and is vibrated to assist compaction of the liquid concrete.